Planning a Processing Facility

The following outline of questions and considerations in new plant design are provided by Koch Supplies, Inc., of Kansas City, MO, and is reprinted with their permission. It is offered here to assist you in decision making about building a new facility and/or use of existing facilities or enterprises.


Processing Facility Plan
 
Land/Water/Energy/Waste Treatment

1. Do you own the land on which you plan to build this facility?
                     ____Yes        ____No
a. Is there adequate water supply available?
                     ____Yes        ____No

1. Wells
2. City water
3. Other (please specify) ______________________________________

b. Is the water a good quality, not requiring pre-treatment?
                     ____Yes       ____No
c. Are there existing wastewater treatment facilities available?
                     ____Yes       ____No
d. What are the local requirements for waste water treatment?
    ___________________________________________________________

2. Do you have a plot plan and topography drawings available?
                     ____Yes       ____No

3. Is the land accessible by good roads?
                     ____Yes       ____No

4. Is the land near to a railroad line?
                     ____Yes       ____No
 
5. Will you have to do extensive clearing of the land or move large amounts of dirt to make it useable?
                     ____Yes       ____No

6. Is there electrical power available and is it a reliable source of power?
                     ____Yes       ____No

7. Is natural gas available?
                     ____Yes       ____No

8. If it is necessary, do you have a good source for propane gas and/or     diesel fuel?
                     ____Yes       ____No

9. What source of power would you prefer to use for your plant?
      ____ Electricity
      ____ Natural gas
      ____ Diesel fuel
      ____ Propane

Livestock Handling: (Cattle, Hogs, Sheep)

1. How will the animals be delivered to the plant?

By truck (what size truck [average count per delivery])? ________________

By rail car (average count per delivery)? ____________________________

2. Will deliveries of livestock be made daily for kill that day? If not, how     long do you anticipate from arrival of animals to killing?     
   ___________________________________________________________


3. Are you in an area where seasons of the year impact the way animals are delivered (for instance, in summer delivery is made during the cool of the evening)? 
                    ____Yes    ____No

4. Should the pens be covered with water sprinklers for cooling the     animals?
                    ____Yes    ____No

5. Should the pens be entirely enclosed for adverse cold and the     possibilities of long delays from animal arrival until killing?
                   ____Yes     ____No


6. How are the animals to be weighed when they arrive at the plant     (individually, on truck scales or gang livestock scales)?    
  ____________________________________________________________    
  _____________________________________________________________ 
  __________________________________________________________


7. Do you expect to need to feed the animals in the pens (this generally is not done unless the stay is more than a day)?
                   ____Yes      ____No


8. Do you expect to clean the pens daily? If so, how will this be done?
   If not, then how often and by what equipment?
                   ____Yes      ____No    
  ____________________________________________________________  
  ____________________________________________________________
  ____________________________________________________________


Important Consideration: If you are planning to handle more than one type of animal, you will need to understand the importance of more than one holding pen area. Cattle, hogs and sheep are kept in different styles of pens and are normally separated.

Production Plans for Slaughter/Offal/Rendering:

1. What is the average labor rate for the workers per hour?

*The answer to this determines the amount of equipment versus the amount of manual labor that should be planned. 
  ____________________________________________________________


2. How many slaughtered per day?

First Year

Third Year

Fifth Year

Type

Quantity

Type

Quantity

Type

Quantity

Cattle Cattle Cattle
Hogs Hogs Hogs
Sheep Sheep Sheep



3. Are there any religious methods and restrictions that must be followed?
                         ____Yes      ____No

4. What are the weight limits of the live animals?

Smallest

Largest  

Type Weight Limit Type Weight Limit
Cattle Cattle
Hogs Hogs
Sheep Sheep


5. Hogs: Which method of hog slaughtering is desired?
          _____Hog scalding/dehairing
          _____Hog skinning


6. What do you want to do with the blood? 
          _____Dry it for fertilizer.
          _____Collect it in tanks for selling as inedible.
          _____Send it to the rendering system for animal feed (mixed with offal).
          _____Save it for edible consumption.
          _____Dispose of it the most convenient way.


7. Cattle: What are the plans for the hides when removed?
          _____Sell them untreated and green.
          _____Salt cure them and ship daily/weekly/monthly.
          _____Do advanced work on them beyond the salt curing stage.

NOTE: If sheep and hogs are to be considered in the project, similar considerations should be given to handling of the pelts/skins.

8. Will the heads be split and the brains saved? 
                    ____Yes       ____No

9. Will the drop items be saved (feet, tails, casings, tripe, livers, lungs,     hearts, chitterlings, stomachs, snouts, ears, jowls, etc.)?

10. Will the drop items that are saved be sold fresh or frozen? 
                   ____Fresh      ____Frozen


11. How will the drop items be shipped (cardboard boxes, returnable     plastic containers, bulk containers)? _______________________________________________________________ _______________________________________________________________ _______________________________________________________________


12. Will plastic bags be used with drop items?
                   ____Yes         ____No

13. Will heads be sold whole; or will the head meat, cheek meat, lips and tongues be removed and skulls sent to rendering? 
  ____________________________________________________________ 
  ____________________________________________________________
  ____________________________________________________________
14. Is a rendering plant to be considered in the project or will the rendering be shipped to another location for handling?
                    ____Yes        ____No

    15. If rendering is planned:

    a. How will the finished inedible fat be handled (barrels or bulk)? 
       ________________________________________________________ 
       ________________________________________________________

    b. How will the crax (animal feed) be handled (bag or bulk)?
       ________________________________________________________
       ________________________________________________________

    c. Is edible rendering desired? 
                        ____Yes        ____No


16. What percentage of the carcasses will be chilled? 
      ______________________ %


17. What percentage of carcasses will be shipped in carcass form?
     ___________ %


18. Will a laundry be provided for cleaning of clothing after each day? 
                    ____Yes        ____No


19. Will a lunch room be provided for the workers?
                    ____Yes        ____No

Is a kitchen to be considered?
                    ____Yes        ____No


20. What percentage of the work force will be women?
     _____________________ %

Processing/Further Processing/Smoked Meats:

1. What percent of the carcasses will be boned-out for fresh cuts?
    __________ %


2. What meat cuts will be produced in the boning rooms?
  ___________________________________________________________
  __________________________________________________________   
  ____________________________________________________________


3. Will hamburger be produced?
                   ____Yes         ____No

If so, will hamburger patties be formed? 
                   ____Yes         ____No


4. If hamburgers will be made into patties, what poundage will be    considered? __

How will they be shipped? 
       ____Fresh in a cardboard box
       ____Fresh in bulk form with paper dividers
       ____Frozen in cardboard boxes
       ____Frozen in bulk form


5. If bulk hamburger is produced, what is the poundage?
    ____________________

How will it be shipped?
    _________________________________________


6. Will any beef be used in sausage making? 
                   ____Yes         ____No

    If so, what poundage? ________________________________________


7. Will retail counter space be a part of this project? 
                   ____Yes         ____No


8. If retail is planned, what cuts will be displayed?
    ___________________________________________________________
    ___________________________________________________________
    ___________________________________________________________


9. Will walk-in sales be encouraged at this plant? (In other words, will the public be encouraged to come by and purchase meat directly from this plant even though a retail counter may not be planned?) 
                    ____Yes        ____No


10. Will the meat cuts be shipped fresh or frozen?

        ____Fresh    ____Frozen     ____Both ways

    If shipped both ways, then what are the percentages of each?
Fresh ___________% Frozen ___________%


11. Will any pork be used for sausage items?
                    ____Yes         ____No

       If so, how many pounds per day?
           _____________________________________


12. What types and quantities of sausage will be produced?

  • Type

    Kg/Lbs
    per day

    Kg/Lbs
    per week

    Linked Bratwurst

     

     

    Polish Sausage

     

     

    Hot dogs

     

     

    Grilled Sausage

     

     

    Luncheon Sausage

     

     

    Mortadella

     

     

    Beerwurst

     

     

    Bologna

     

     

    Loaves

     

     

    Cooked Salami

     

     

    Salami

     

     

    Dried Salami (natural and slow fermented)

     

     

    Salami (fast fermented)

     

     

    Beef Jerky

     

     

    Beef Sticks (snack food)

     

     

    Other (specify)

     

     

b. What type of casing will be used in sausage production?
       ____Natural
       ____Collagen
       ____Cellulose
       ____Fibrous
       ____Plastic


13. Will hams be smoked and cured?
                   ____Yes         ____No

      If so, what percentage of total hams per day will be used for this?

Type

Kg/Lbs
per day
Kg/Lbs
per week
Boiled ham/water cooked
Boneless ham/smoked
Whole bone in ham/smoked



14. Will hams be sold whole or sliced, boned or boneless?
    ___________________________________________________________
    ___________________________________________________________

b. Any other types of injected products, such as:

Type

Kg/Lbs
per day
Kg/Lbs
per week
Whole roast beef
Sectioned/formed roast beef
Smoked beef
Pastrami



15. Will bacon be smoked and cured? 
                    ____Yes          ____No

     If so, what percentage of total fresh bacon per day will be used for this?   
__________________________________________________________ %


16. Will bacon be sold in slab form or sliced? 
        ____Slab     ____Sliced      ____Both ways 
     
        If both, what percentages of each?
Slab ___________% Sliced ___________%


17. How is the bacon going to be packaged?
___________________________________________________________
___________________________________________________________
___________________________________________________________

18. How much of the production will require vacuum packaging?
   ___________________________________________________________
   ___________________________________________________________
   ___________________________________________________________
a. What products?
    _______________________________________________________    
    _______________________________________________________
b. What percentage of each product?
   _______________________________________________________
   _______________________________________________________


19. How much lead time do the suppliers of packaging in your area need?
   ___________________________________________________________
This determines:
a. Order quantities for supplies.
b. Necessary space for supplies to operate.


20. How much cooler/freezer space should be considered for the finished product, in terms of days-of-production? (Normally meat is stored in the cooler for three days and in the freezer for seven days.)
    ___________________________________________________________
    ___________________________________________________________

Important Consideration: It is good advice to allow for an area near the processing room that carries some spare parts, can be used to store cleaning equipment, store forklifts during the night charging time and can provide for the necessary maintenance work.



Resources:
Reprinted with permission.
Written by Jim Masterson, Koch Supplies, Inc., 1411 West 29th Street, Kansas City, MO 64108; (816) 753-2150; fax (816) 753-4976. E-mail: